Podlogs at liohu with their own hands. How and why do you need a pidlog at the pidval? Three principles of ground control schemes

For rich people, they are associated with good people. I chain the world correctly. If you need to insulate, re-ventilate, build up a sump - additional space for saving agricultural products, you are ready. It is obvious that even in the basement there is a standing vogkіst, it is devastatingly pouring like on the foundation, so on the wall of the booth. Also, to the very bottom top, I should give due respect.

In order to find out why you need to write a log in the basement, you need to know that for this there are only two ways:

  • on the ground: adobe or concrete pads
  • that pіdloga, scho laying on the logs

The primary choice between two options may be the rіven of ground waters. If the stench is close to the surface, then it is better to lay concrete underlays.

The cob works - tse tidying up smіtta, virivnyuvannya that tamping the surface of the earth. If you want to make mud puddles, then the stench will be warm without a doubt. If your choice falls on a concrete base, then such a pіdloga will be cold for adobe, and therefore mіtsnіsha for it. The foundation of the pіdvalu is to blame for the buti on the frost-resistant clay.

P_dval p_dvalny top on the ground

Vlashtovuemo adobe pіdlogu


For vashtuvannya, the foundations of the foundations were followed by a ball of crushed stone, mixed with clay. The tovshchina is to blame for the ball, but not less than 10-12 cm. After that, as the first ball is dry with crushed stone, we lay another one like this, a lesser comradeship: 6-8 cm. For example, vapnyano-clay rozchinym.

Vlashtovuemo concrete pіdlogu

For concrete foundations, it is necessary to prepare the foundation. Vlashtovuetsya, so the titles of the ball, scho pіdstilaє. Winning from crushed stone and gravel. Dalі the basis virіvnyuєtsya that is strengthened. In order to ensure that the basement was filled in with equal evenness, it is indicated by the height of the basement and it is indicated on the wall behind the additional marker. Dali pratsyuєmo gidrorivnym: zgіdno with a mark on one wall, we know you need a height on the protilezhnіy and marked with a marker. Fallow, in addition, the area is large, we will install one or two marks at the sight of a metal rod at a height of 1-1.5 m, one in one, for which it is also necessary to take a height, I will find it for help. The rod of the trail is simply driven into the base of the sublog.

Cement rozchin 1:5 is filled with a sub-log. Focusing on the marks, as a rule, we turn the ball to concrete. In the course of the work, the bars with marks need to be twisted and reinforced with them. After 3-4 days in the world, the rosette will be hardened, after the viconaty I will fill the residual filling with a rare rosette, as we will use all vadi. Under the hour of the formation of another concrete ball, it is necessary to periodically revitalize, in order to improve the characteristics of the mineral.

Waterproofing sublogs

At the time of the high level of the ground waters, there is a superfluous addition of waterproofing. For this purpose, we cover it with bituminous mastic and lay a ball of roofing material (two balls are possible, smearing them with each other with mastic). After that, if the surface hardens, then pour one more ball of concrete space. After that, as this ball is in the future, we fill in the ball of concrete screed, which is vibrating. Її tovshchina can revisit 1 div.

Podlog podlogovoy on top of the lags

As if you were viruiuyuchi, why zrobiti pіdlogu in the podvalі, zupinilis on tsmu variantі, sіd vrahuvati deyakі nuances. Fallow in addition, some kind of soil (dry chi vology) and equal ground water, virishuemo nourishment of waterproofing. As soon as the moisture content of the temple is cleared up, then the wooden underlays follow the sound and the concrete work. Yakscho all harazd, let's get started. Need:

  • logs: from well-dried wood with a diameter of 150 mm.
  • boards: tongue-and-groove 40-50 mm.

Treat the tree with an antiseptic spray. Cut the boards to the dovzhina, yak by 2-3 cm. Lay the first plank in 1.5 cm from the wall, so that the deformation of the underlays in the natural soil under temperature changes is avoided.

For log decks, cut according to the previous date. Under the deck (bar) it is necessary to lay sheets of roofing material. Install the lags strictly for equal. After that, as it is crumbled, we lay the flooring from the boards: with 6-7 cm flowers, we clog them up, attract the boards to the logs.

The wooden balls of the village on the wooden boards are guilty of "marveling" at the different sides. So pіdloga vyyde more equal. Behind the wooden flooring, you can put linoleum, or else cover it for underlayment.

At large vipadkivs, at private booths, they can cover a small area, so the Vlasniks slander with everything by truth and by falsity, so that there will be more free space. For example, to finish the hospitality of the dimensions of the accommodation (zocrema, yoga height) stand at that point, as if it were a victorious one like a garage. Ale, and in a great bliss, you want your mother to be able to break out at a later age. To the very same, a lot of zamіsky domovlasniks ask themselves questions about those, how to rob the tax as low as possible. Deyakі people virіshuyut zavdannya cardinally - just deprive the pіdlog in the podvalі budinka such as vin and buv after digging the ditch, tobto ґruntovim.

If it is necessary to grow up on a well-drained riverbed, it is not to blame for any particular problems. From the other side, if the soil under the bunker is to finish the waters and the waters come close, then the work from the obshtuvannya will be much more expensive.

If the houses are still at the stage of life, then, as it is possible, it is better to choose string foundation. Such a pіdkhіd will give sevnі perevagi when obshtuvannі pіdvalny pіschennya: mіtsnі stіni, pochatkovo zoning expanses vіdpovіdno to living rooms thinly.

Methods for arguing pidlogs

For sporudzhennya pіdlogi vіdvalі can vikoristovuvatisya such materials: concrete, soil, logs, monolithic slabs.

When vikoristanny monolithic slabs can talk about the maximum nadіynіst pіdlogi. Obviously, such an undertaking can only be built at the early stages of building a house, just before the foundation is laid. In addition, the basement was made comfortable and warm, as if it were the so-called “Swedish stove”. Tsya technology can be used for laying insulating under the slab. As in Budov, the appearance of the basement was transferred on top, this option is also shorter. Concrete pouring can be carried out directly on the ground, but even better, before zim, tamp the sand and gravel, making your own “pie” (pillow) from these materials. Such a pie promotes the supremacy of the structure, especially in the presence of loams and clay.

Substrate concrete in to the basement- The widest option.

It is necessary to fight in quiet budinkas for victorious lags, to have a minimum level of flooding in the groundwater (otherwise the high-yielding drainage system was destroyed). Krіm tsgogo, such cover can be grown in garages, in which there is a deep loch.

Ground conditions can also be relevant, but only in quiet weather, if it is necessary to protect the height of the place or pennies.

For pouring concrete pidlogs in the basement, you need the following tools:

  • Betonozmishuvach. As you don’t have much, you can mix up the lines manually, adding small squares to the log. Irrespective of those that such a robot takes up a lot of strength, at the footer you can vikonate without problems.
  • Cologne and grater. Tsі іnstrumenti become nágodі, if it's necessary to virіvnyuvaty cement rozchin. Concreting at times comes out borderline yakіsnim. In addition, it is necessary to sand the underlay, as soon as it is necessary to transfer the flooring of some kind of coating for the underlay. If the flooring will be made of wood, then it is not necessary to additionally repair the concrete underlay.
  • Bulgarian woman with discs on the stone.

As a replacement for concrete mixes, mix the ingredients in proportions, as shown on a bear with cement.

The stages of the work carried out are as follows:

  1. We will take a future rye ahead of us, and with it, the bottom of the pit will be strengthened, as if in the future camp of a pitfall. The soil needs to be strengthened with any available tools.
  2. At the bottom, a sand hangs in pits, which is necessary to level it and lay it in an equal ball of 10-20 cm.
  3. On the sandy ball there is a medium fractional crushed stone. A pillow made of crushed stone is also significantly strengthened. Come out your own "pie" from the pisku and rubble, which will become the basis for the creation of the basement.
  4. Let's wait for the devil to create a waterproofing ball. Most of the views for which zastosovuetsya traditional roofing material or as a modern material for the look of the canvas. The laying of roofing felt is to be overlapped from the approach of the canvases one by one by about 10 cm.
  5. Now is the time for thermal insulation. In order to build a basement, call for insulation on the basis of stone or basalt wool, fiberglass. Materials of this type will be very clay to the vologer, which has appeared, resurfacing them themselves to the flooding of the base. Obviously, mineral-cotton insulators become unbearable, so it is recommended to use vicorous insulators (for example, polyurethane foam).
  6. It is also possible to install thermal insulation in the basement of a private booth made of high-width foam plastic. The material can be laid as much as possible. All the gaps that have been closed, obov'yazkovo curl up behind the help of mounting sealant.
  7. Promoted respect it is required to add to the gaps, as they will be installed in the area of ​​the insulation of the heat-insulating material with the walls of the basement. In these zones, it is not varto to squirm with pins, blocking a particular gap. Vіn nebhіdny, to the fact that in case of swelling of the soil without a new heat-insulating ball, that concrete screed can be deformed. Sound, the width of the gap is selected from a couple of centimeters.

After all stages of preparation, we proceed without intermediary until the pouring of the concrete gap.

Concrete bath

If some important fittings are installed in the basement (for example, laying tables for the mains), then the sublog needs to be additionally reinforced and the work of a larger company (over 10 cm). If there will be no serious pressure on your basement, then it is not necessary to carry out the reinforcement of the foundation in this direction.

For the folding of the reinforced belt, a mesh of reinforcement is cut. The thickness of the reinforcing battens is to be 5 mm. Їх pov'yazuyut mizh with a dart.

Cement sizing is necessary to work in the right way to the designation of the sizing ratios. All the elements of the possible variety need to be mixed in the concrete mixer. Step by step, water is added to the roses, until the wines reach the necessary viscosity and plasticity.

Concrete laying can be done in stages, but without interruption. Rozchin need to be checked on all surface areas. Before pouring the concrete, it is best to install beacons, as if to visually demonstrate the torso of a concrete ball. "Pirig", which vyyshov from sand, gravel and concrete, successfully copes with adventures.

In order to ensure that the tovshchina to concrete was the same, vikoristovuyut a special lighthouse profile.

As soon as the cement crack is dry, it is necessary to sand the concrete surface. Ale before the process of obov'yazkovo scurry expanding seams. A Bulgarian with a special disk on the surface is cut in such a way that a sprat of meters was seen between the seams. This simple way to help prevent the cracking of concrete underlays.

Clay pidloga

The pristrіy pіdvalnykh pіdlog on the ground may be one neperechnû pass before the great concrete plating - the pіdlog will be warm. Krym tsgogo, clay - vіdmіnny gіdroіzolator. If the whole process of laying on the ground is carried out correctly, then such a surface can last for more than a dozen years, without waiting for repairs and special maintenance.

Stages of work for the creation of sublogs on the soil are as follows:

  1. Preparatory stage: the bottom is resolutely shaped and strengthened, so that the base was as strong as possible.
  2. Mixing crushed stone with clay, after which the sumish wriggles in a ball of 10-20 cm.
  3. Under the crushed stone ball, it is obov'yazkovo to fight for help from expanded clay or slag. Qi materials in which case will act as insulators.
  4. In order to give the maximum strength, the first crushed stone ball is concreted with an additional ball of cement-food grade.
  5. After hanging a clay and crushed stone ball, it is necessary to lay one similar ball, making your own cake from materials.
  6. The thickness of the soil logs in the basement of a private booth will be maximum, even though the balls of the yakomoga are thin. It is necessary to draw the balls until the moment when the necessary comradeship is reached.
  7. As soon as the surface of crushed stone and clay is completely dry, it is necessary to coat the soil with rare clay. As soon as you see cracks, it is also necessary to lay them down for an additional clay rozchin.
  8. For pіdlog on the top coat, you can use ceramic tiles, laminate or even more pokrittya for pіdlog.

Laying pidlogs on logs

If you have done the construction of a log at the basement of your private booth on wooden logs, then it is necessary for us to choose a wooden tree, and also to think about attaching a waterproofing ball.

The best way to choose a good drying beam, which will become a miraculous solution for the lag. Rosemary is recommended to choose 15/15. Small board cuts (4-5 cm) will become the basis for the surface. On the vіdmіnu vіd pіdlog оn the soil, it's not necessary to lay the impersonal balls and work the pie in any weather.

Steps work like this:

  1. The wood we have before needs to be processed with antiseptic warehouses. Special respect should be attached to the sides and the end of the board.
  2. The beam is cut into the ribs of the necessary dozhina.
  3. When laying the boards, there is a trace of a small gap in a sprat of centimeters, which can be between the wall and the first board.
  4. It is necessary to lay roofing felt at the sprat of balls at the places of roztashuvannya lag. Between the lags, they are guilty of a great vіdstanі (calculated in a vіdpovіdno up to a dozhina plank).
  5. To fix the bars, vykoristovuyutsya dovgі tsvyakhi, yakі slіd clog under an insignificant kutom.
  6. As soon as you chose the boards, what to groove, then I will step on the skin according to the system of grooves.

As a result, you chose the structure on the logs, behind the back of the earth before the burying of the earthen bottom of the pit, the shards of the pit in the pit of the mother's booth mean tovshchina. The cost of destruction may be no less than 30 cm.

If you want to add water to your premises, then the option for a low level of a private booth with planks is better not to choose, so that after an hour, no matter how high the quality of the waterproofing, the boards all the same start step by step.

The basement on top is one of the main places near the booth. If the wines (on top) are properly clad, then at the top of the cladding tops, it will be warm and quiet. Also, you can play the role of a warehouse or a garage, mothers are otherwise recognized. Somewhere in the world, navitovuyut stones. That is why it is important to keep the dryness here, but it is important to keep it dry. How to correctly fill in the sublog on the basement version? Let's find out what is necessary for whom and how the procedure is to be carried out.

The basement can be not only miserable, where different communications can take place, scorching boilers have been installed, or all old and uncommon speeches can be stoked. The basement on top of the booth can be:

  • collection for products, blanks;
  • living room;
  • garage;
  • a hall for doing sports with various exercise equipment.

If you turn on your fantasy, then you can see more rich options, like you can have a basement on top. However, in order to implement all these ideas, it is important to talk about the presence of a new good status and ensure waterproofing. This need is due to the functional features of the basement.

Pіdval budinka chi be-yakoy іnshої budіvlі y bolshostі zavzhdі sоtsіyuієєs іz vogіstyu. However, zayva vogkіst or dragged down the middle of the pіdvala threatening the ruined foundation of the booth, and also, and poshkodzhennya budіvlі in the future. To the very same, at the stage of everyday life, things vibrate in the future.

Here it is possible to increase the volume not only of the walls and sublogs, but also to learn more. Before the speech, this ostentatious show will be great at any time, lower at the booth itself, wind up unimportantly on the height of the waterproofing. Vologa from the soil easily penetrates concrete and other materials, such as a plinth. The water is especially actively used up to the foothill, as if the soil waters lie close to the surface of the earth in this area. Don’t forget about the spring floods, if the rivulet of the water rises high for an hour.

Note! The large amount of water in the basement is not only unsafe, but it creates a middle ground in the water and stimulates the development of mold fungus, but it also negatively spills onto concrete, mimicking the new variety of speech. The material is worth the cost

Such an effect is also characteristic for the pіdval, how to achieve sharp and significant temperature drops. If there is no scorching in the new, then, better for everything, in the basement version you will be cold, which, obviously, is beneficially indicated on the products that are saved in the new, and home preservation. Ale navіt yakscho pіdval to serve as a place for sberіgannya produktіv, yakіsna podloga in the new all the same can be. If you want wine, maybe not so beautiful and neat, like a house in the living quarters.

Pidloga at your pidvali

Pіdlogi, scho oblashtovatsya in pіdvalny pіschennі, pіdnі vіdpoіdati deyakim vimog ta buti:

  • mitznimi;
  • prepared from yakіsnih materials;
  • installation strictly according to the instructions;
  • good waterproofing;
  • insulate.

Sound, as if in the basement, the basement is laid with concrete, the wines are laid directly on the ground. As soon as the robots are wound correctly, then there will be no empty ones under them and the foundation will be vide yakіsnoy. In my opinion, all the attention to the basis is applicable to those who are known under it, which means that the lien will be nadіynoy and mіtsnoy and serve for a long time.

Note! Oblashtuvati good pіdlogu in pіdvalі koshtuє it's expensive to do it, especially how to go about the place, roztashovane entrusted from the ground waters. However, it is possible to save a few koshtіv on the finishing decoration, so that the basement on top is far from being able to look beautiful. Golovnya, schob vykonuvav their main functions, and in the middle it was dry.

Methods for arguing pidlogs

Pidlogs in the basement can be worked by kilkom in ways, skin from some of their own particularity vikonannya works. For folding, you can zastosovuvat wooden logs and boards, without middle soil and clay, concrete sumish, etc.

Note! Nayvischoy mіtsnistyu maє pіdlogu, prepared from monolithic slabs. However, such a design can only be built at the cob stage of life, if the stove is simply not possible to carry in the basement.

Pіdloga z concrete

Tse, perhaps, the most wide-ranging version of the creation of pidlogs on the basement surface, the shards of concrete foundations are not for nothing vvazhivayutsya mіtsnimi and nadіnymi (їh dogovіchnіchnost revered by ten years), that varіst robіt will be small. Prior to that, at the same time, robots can be carried out directly on the rammed ground. Even though gravel and sand lie flat, the superstructure of the structure is vastly different.

Note! It is always recommended to use concrete foundations to make sure that soil water is planted close to the surface of the earth.

You can create such a subtext on your own. Here, it’s more smut to cover the garn of the pillow, as the mother’s tovshchina is close to 15 cm. So the beast on the tamping ball is squealing expanded clay or crushed stone, so that it can be rammed, if it’s important to lay a stone and a superfluous waterproofing material (for example, roofing material). In case of this, the protection of the water is to be blamed for being as superficial as possible, which means that the outer layers of the material are hermetically sealed with an overlap of at least 20 cm.

Another ball that is laid under the concrete underlay is the whole ball of heat-insulating materials (for example, squeezing, basalt material, polyurethane, foam plastic). The stench of protecting the warmth in the middle of the place will block the streams of cold that come out of the ground. Sticks between layers of thermal insulation are also recommended to close, vicorist mounting pin.

Important! A small gap can be left between the wall and the heat-insulating material. Vіn to ensure the possibility of thermal expansion of the material, and therefore to help avoid deformation of the insulation.

Change the sub-log of concrete in addition to reinforcement, as well as win over victories. It is not possible to allow the demonstration of critical attention without rotting. The best way to vikoristovuvat sіtku z tovshchina prutіv close to 5 mm. Just after that, a pouring of concrete summation is carried out. The tovshchina of the ball, which is being filled, is to blame but not less than 5 cm, but if it is planned to install important fittings, then the screed will be close to 10 cm.

Clay pidloga

Sometimes it is covered with clay soil. This option allows you to protect the bones. Such a basis is breathed in by the team, that the basement on top will be richly warm, lower at the bottom with concrete underlays. Sound the wines are made of clay, as by itself it is a miraculous waterproofing agent. The term of service of such a basis will be greater, lower than 10 years, so that everything is reduced to the rules of installation work.

At the preparatory stage, there is a strengthening of the grounds and their development. The base is filled with expanded clay - this is how an additional heat-insulating ball is formed.

Please! The maximum value for such undertakings can be given by concreting the first crushed stone ball.

Then the rubble churns with clay, and the warehouse, which is wiyshov, wriggles onto the deepening soil with a ball of tovshchina close to 20 cm. Before the speech the thinnest will be the balls.

The final stage is the plastering of the dry surface with rare clay. She will help and fill in all the cracks that have appeared on the surface of the base. Such a basis can be practically closed, whether it be some kind of back-up material. And most of the clay underlay is covered with paving slabs.

Laying pidlogs on logs

Chornova pіdloga in the socle version, made of wood, vikonuєtsya only in the fall, as the effect of the podloga is minimal or it is a high-yield waterproofing. In this fall, the foundation rests on the logs - supports, like raising the black underlay over the surface ground.

For the lag, the next vikoristovuvat mіtsnu and nadіynu wood - the best pіdіyde timber 15x15 cm, good drying. And the basis of sprouting can be made from a zavtovshka board up to 5 cm.

Note! Bagatosharovy "pyrig" is not necessary for different cladding of the foundation on the lags. Ale, prote, the death of a dead man can become no less than 30 cm, so as a lie, all the same mother to endure the great comrade.

At different wooden bases, it is important to think over the lining of waterproofing. And the tree itself is treated with antiseptics and zahisnimi warehouses. The lags are installed on the ground and turn around for the equal. Roofing material spreads under the support, which will secure the protection of the tree from vіd vologi.

Vlastuvannya nadіynoї pіdlogi vіdvalі private booth

We marvel at how the black lining looks like on the basement version of the booth. We are going to prepare all the necessary tools, typing some of them in the field according to the chosen technology for creating pidlogs at the base.

Tools and materials

Crushed stone, clay, sand, water, shovels and buckets are needed for making clay plows. For wood - timber, boards, ruberoid, rubble, flowers or screws, saw, cutting tool, hammer. For the creation of pіdlog іz concrete it is necessary to add:

  • betonozmіshuvach or large єmnіst і budіvelny mixer;
  • a grater that rule for virivnyuvannya filled base;
  • slats that act as beacons (beacons can be made from cement sum);
  • budіvelny rіven, for yakim virіvnyuvatimut pіdlogu.

Please! For the installation of a screed in the basement version, it is recommended to vicorate quarry sand, crushed stone and cement grade M400. Some crushed stone can be replaced with expanded clay.

table. Equal characteristic expanded clay and crushed stone.

CharacteristicRubble
MasaEven lighter material, no matter how big the factions are.I know the mass of the material, it is possible to work with it, if it is not easy to overtighten rubble in small portions.
Thermal insulation powerIt is possible to create a basis for using expanded clay to create a warm base - the material can improve the characteristics of thermal insulation.Bad signs of heat insulation, it will be cold.
Reaction to contact with waterVologu actively porous, shards are porous material.Chi does not react to the volog, does not select її, through which the term of the service is increased.
VartistFinish expensive material.Cheap material.
MitsnistNevisoka, through which the underlays for adding expanded clay will be less overhead, lower from crushed stone.Dosit material, building vitrimuvat critical navantazhennya.

In such a rank, at the bottom, where the flood is not cleared up, as a whole, there can be vikoristany expanded clay instead of crushed stone. It is especially important in that vipadka, because it is necessary to build the foundation as warm as possible. Then, using crushed stone allows the cost of preparing the foundation in the basement to be cheaper.

Preparation

Before that, the work of plowing pidlogs in the basement begins, a series of preparatory work is carried out, which includes the determination of the level of ground water, and the better, the more folding will be the robots themselves. It is also recommended to take a look at the height and height between the foot and the foot of the foot. Sound out, do not exceed the parity of meters, prote, so that the rhubarb of the ground waters is high, the height between that stele can still be changed. Dali carried out a survey of the necessary quantity of materials.

Just after that, proceed to the earthworks, so that a foundation pit is created, the mold is deformed. Zaiviy ґrunt is blamed for pіdvalu. Dali svoryuєetsya drainage ball with expanded clay and pіsku zavtovshki close to 5 and 15 cm іdpovіdno.

Video - Preparation of a chemical base for a screed

Peculiarities of technology in the process of robotic power

The most popular are concrete pidlogs. To this we will look at the procedure of creation itself. Dekilka is glad to help you to build concrete pidlogs in the basement as much as possible with the best and the best:

  • if it’s rough under the light softness, then it is recommended to reinforce the screed - to increase the strength;
  • in applications with an area of ​​over 6 m 2, it is necessary to form a special expansion joint. Він allow roztreskuvannya concrete base;
  • The concrete after pouring will shoal after about 5 decibels of water and the temperature will be close to 21 degrees. If it’s colder at the base, then the screed will be no less than 10 days old. The last term dry borrows less than 30 decibels;
  • it is possible to operate the screed and carry out further work only after a complete hanging;
  • all tools and materials at the necessary amount of responsibility should be hand-me-down for an hour of work; іnakshe є rizik zіpsuvati screed, docks vіdbuvatimutsya poshuki that chi іnshoy і tool chi material;

  • betonozmishuvach - the best option for mixing a large amount of sumish. You can її not buy, but take from hire;
  • pouring the screed starts from a distant exit from the basement of the kuta - it is not necessary to allow the need to pass over the concrete, which is not caught;
  • less than 30 quills are given on the surface. After that, the concrete will accumulate, and you won’t be able to correct the pardon;
  • the soil under the screed can be tamped as much as possible.

The basement space is often small, so the housekeepers think about those, how to work for a lie so that the yakomog occupied less space.

It is especially important in the minds of a tight garage, where in a small space it is necessary to install equipment for a car, and home preparations. To that rich man who goes along the simplest path and robs a pidlog in the ditch of the soil.

Peculiarities of basements

Like a garden of rotting on dry soil, vitrati on the plinth cladding on top 2-4 times lower, lower in the heads of a high level of ground water and soil, saturated with water. The choice of the installation option for laying down the logs depends on how you wash your life on the job.

As if at once there will be a pіdval i lioh, it’s smarter to choose a line foundation, to the one who will give a lot of surfacing for an hour of cladding the internal space of the pіdval: superficial walls, which transcend the penetration of the wind and water, demarcation is placed on the surrounding stone zone for roses.

As a construction of underlays in the basement, vibudovuvatimetsya on the logs, behind the back, they transfer sufficient burying at the ground. Vono may be 30 cm larger, lower for earthen status. Krіm zahistu vіd vologi, pіdloga is guilty of hіdno to stand up to the vise of the soil. Therefore, in the old booths on the basement, it is necessary to add additional stones, like supports, stitched through the skin 3-4 m.

Turn to hell

Variants of vlashtuvannya p_dloga in p_dval_

  • concrete;
  • sublog on the ground;
  • on the lags;
  • monolithic slab.

In the rest of the fall of the day, it is most hopeful to go out. Wine is mounted on the cob stage of everyday life under the hour of laying the foundation. If brucht is installed on the UWhP (insulated Swedish plate), then it will be more comfortable, the shards will be the upper part.

Concrete cover should be stunned in quiet valleys, if there is a high level of groundwater on the road and the most necessary protection is required.

Like in a booth, there is a basement on top, this option is also shorter. Concrete can be poured directly on the ground or on a sand-gravel pillow. Another option is the most nadirny, as if on a distance, strongly heaving soil: clay or loam.

Pidlogs along the lags vlashtovuyut at quiet budinkas, where they are not afraid of being flooded with ground waters, or the yoke drainage. Trees of overlapping can be worked in garages, where there is a deep basement. Zemlyana podloga is relevant in quiet situations, if the most important factor is economy of space or penny koshtіv. If the soil is on a subsidence gap, the best option would be to install a reinforced concrete foundation such as this, so that it could stably trim the shape of the soil moving hour.

Turn to hell

How to build a concrete pad in the basement

Turn to hell

Tools and materials you need:

  1. Betonozmishuvach. Although it is not possible to beat the technique, concrete work can be done manually and applied with small blows. The work of a labor worker is trival, but in small areas you can vikonati її.
  2. Owl shovels.
  3. Mistkosti for transfer to concrete.
  4. Tools for virivnyuvannya cement-food razchin: trowel and grater. The underlay will need to be sanded, as it is planned to lay linoleum on it, or else cover for underlay. As soon as a wooden flooring is installed on the logs, it will not be necessary to mount it.
  5. The grinder is equipped with a disk for working with concrete and stone.
  6. From the materials needed cement grade M 400, sand from the quarry, crushed stone of the middle fraction, water.

Turn to hell

Stages of pouring concrete underlays at the basement

  1. The bottom of the pits, recognized for the vlastuvannya of the basement, is vyrivnyuetsya for additional hydraulics. Strengthen the soil with a vibrating plate or manually.
  2. Prepare the base with a 10-15 cm zavtovshka.
  3. Crushed stone and gravel are poured onto the sand. Qiu pillow also needs to be well strengthened.
  4. Gave the blueprint for the installation of a waterproofing ball. The most suitable for vicory is schіlny polyethylene or roofing material. Cloths of these materials are laid with an overlap of 10-15 cm and the bindings go on the wall at a height of 20-30 cm. Polyethylene or roofing felt is neatly folded at the corners, forming a straight cut, and fixing with a stapler.
  5. Let's proceed to the laying of heat-insulating materials. For vlastuvannya podlogi it is not recommended to vicorist materials based on fiberglass, stone wool or other wool. Tsі insulators will do better to the vologer, as it will inevitably be at the basement for the best waterproofing. It will penetrate into the insulation from the wind and settle in a little visible condensate. Nezabarom such material becomes irrelevant irrespective of the fact that it’s like a violin: at the sight of slabs or rolls.
  6. For vashtuvannya heat-insulating ball of concrete pads of vicorous foam, the thickness is not lower than C25 tovshchina 5 cm.
  7. Particular respect is given to the gaps between the polystyrene foam and the walls of the pidval and yoga cuts. In these places, they don’t win the installation pin, but they deprive them of the titles of technological progress or a compensatory seam. Vin is needed in order to ensure that the soil is not deformed during the hour of heaving. In the case of large vipads, it is enough to close the gap with a width of 1.5-2 cm.

Turn to hell

The process of pouring concrete

  1. Yakshcho in Pidvali plan to Vlishtuvati Sports of the absterne, he will know the importance of the return of the Sports shell, the pidlog is tramically robbed by Armovani Tovshchina, more than 10 cm. which will not be necessary.
  2. In order to build an armored belt, we prepare nets with smooth reinforcement with a thickness of 5-6 mm. Metal shears are tied up between themselves with a knitting dart, or they are made.
  3. Cement-mixing is prepared as follows: take 3 parts of a milled crystal sieve with large cores of sand and 1 part of cement grade M 400. Mix the ingredients with concrete mixing. You can add more stone, or rather - vіdsіv. Yogo kіlkіst can change 15% of the total obligation to change. Then add water in small portions. If the warehouse reaches the required viscosity and plasticity, the concrete is laid at the wind or the greater capacity and wag on the reinforcing ball.
  4. Concrete step by step, evenly vibrating the differences in all areas of the state. Schob accurately vitrimati the height of the ball, install beacons. When you do not forget about virivnyuvannya.
  5. After the concrete has matured, proceed to the first grinding. Ale, before tsim, it is recommended to expand the stitches. For the help of an angle grinder, that disk is cut through the stone on the stone so that the gap between the seams becomes 4 to 6 m.

How to work for a pidlog in the basement of a booth, so that it would get out of ergonomics and superficially against the penetration of water from the soil? Aje is the basis of the life of the future, constantly succumbing to the grip of the soil and pouring into the new ground waters. To that obshtuvannyu under the bottom of the top of the next give special respect.

Іsnuє kіlka ways for arranging the basement. Basically, there are the following options:

  • concreting;
  • adobe pidloga on the ground;
  • base on logs;
  • monolithic "Swedish pie".

Concrete laying can be carried out directly on the ground, or it would be better to drop the ball on gravel or sand. This option is to increase the surface on the plots with clay and loamy soil.

Set up a concrete booth

Clay pads are laid on the ground. The advantage of clay is accessibility, warmth and waterproofing. In the same way, this way is more good for protecting the height of the place, which is an important factor for pіdvalu.

Clay pidloga

The logs are laid on the logs, as if the dilyanka is on well-drained soil, otherwise there was a yakish drainage system around the perimeter of the booth.

Pidloga on logs

The monolithic “Swedish Pie” is a monolithic slab that is made up of foam plastic in the lower ball and a warm pad built in at the upper ball. This type of landscaping is suitable for water-filled plots with subsoil waters. Vikonuetsya at the stage of building the foundation and installation of the drainage system. In this weather, the basis of the booth is the most superfluous, moisture-proof and warm.

Monolithic "Swedish pie"

Slabstuvannya concrete pіdlog

The first step is to start cladding of concrete foundations, it is necessary to make concrete for some applications, and in some cases it is necessary and possible to concrete the base. Concreting dotsіlno for offensive purposes:

  • singed;
  • with a socle zhitlovy top;
  • special purpose: workshop, boiler room, garage;
  • lyoh for vegetables and conservation;
  • іz zayvim instead of vologists in the subfield.

Substrate concrete

Concrete for the basement of the basement of a private booth may have the following advantages:

  • Concreting and lining waterproofing of the basement allows placing a sauna, a spa hut, a garage, a boiler room in the premises.
  • concreting is reduced in vmіst vologii i prodovzhuє terms of exploitation of all life;
  • move sanitary wash;
  • Concrete transfers appear when clods and grizzlies appear, as well as fungus and splashes.

The walls of the foundation are permanently strong to the pressure of the ground waters, to which the reinforcement is collapsed in the presence of a constant flow of water. Underground at the basement of concrete can create an additional barrier for the penetration of water.

P_dstava podval z concrete

Important!

At the basement, which is scorched, the presence of a concrete foundation can lead to the collapse of the foundation structure, which causes a laborious and expensive overhaul.

The non-flushed basement, which is used less for the storage of food preparations, is not concreted.

The foundation of a private booth with a concrete pad

Tools and materials for vikonannya robit:

  • betonozmishuvach;
  • vibrating plate;
  • sovkova that mushroom shovel;
  • cebro for concrete warehouse;
  • trowels that mash;
  • Bulgarian;
  • cement m-400;
  • squeak, pisok;
  • middle fraction crushed stone;
  • water;
  • polyethylene, zavtovshki 300mk;
  • plastic piping for reinforcing mesh;
  • reinforcing mesh with a bar of 3 mm, and the size of the room is 3-5 cm;
  • knitted drіt zavtovshki 3mm;
  • lighthouses;
  • damper line.

Concrete base pіdvalu

Stages of concreting

The spore of concreted footings at the footings significantly promotes the operation of all constructions of life.

Vikonati concreting can be done independently, keruyuchis cover instructions installation:

  1. Pidkapati grunt by 30-40 cm, level and tamp for additional vibrating plates.
  2. Vikonati a pillow from a ball of clay with a height of 7-10 cm and a ball of pebbles with a pіskom with a height of 7-10 cm.
  3. Lay a bud_velnu overlap on the walls with a height of 8 cm.
  4. Lay a reinforcing mesh on the pidpirki. Stikuvati smugi must be overlapped on one dressing room, tied up with a knitting dart.
  5. Install the beacons behind the auxiliary line with a winder in the reinforcing mesh 30mm. Vіdstan mіzh beacons are rozrakhovuєtsya vhodyachi z dozhini rules and become 20% of yogo dozhini.
  6. Glue the damper line without the middle on the wall, in front of the polyethylene.

Important!

Yakshcho the wall of the wall is moved 7 m or the base of the G or P-like form, it is necessary to control the deformation seams. Before pouring the concrete on the reinforcement, it is necessary to install a wooden formwork, so that the straight cuts are equal to the size. After hanging the screeds, the formwork is dismantled, and the seams are filled with damping material.

  1. Prepare concrete. Proportions for cement grade: 1 part cement: 3 parts sand: 5 parts gravel, water. All the ingredients are step by step added to the concrete mix and resolutely mixed. It is not recommended to use a shovel to mix the rozchin manually, the shards of the sum may come out inaccurate.
  2. Pour concrete gaps on the reinforcement, virіvnyuyuchi rule z beacons.
  3. As soon as the cement is more likely to accumulate, it is necessary to build beacons, laying a sheet of plywood in front, chipboard or boards, so that the surface does not get damaged and the footprints are left behind. Zashpaklyuvat utvorenі fossa cement-pіschanim rozchiny.
  4. Vkriti concrete pіdlogu polyethylene і pokati dozrіvannya. The strength of the concrete is collected for 28 days.

Screed pіdlogi - effective method ryatuvannya vіd zayvoї vologi i musty "podvalnogo" smell. Also, the acceptance advantage is the availability of all materials, the low price and the ability to perform assembly work independently.

Concrete base for the basement with integration into the screed

Cladding of adobe pidlogs on the ground

The main advantage of the soil is the first thermal insulation.

Clay pidlog near the pidval

Yakshcho all works with slabstuvannya vykonanі yakіsno, vіn serve as a good waterproofing agent.

Materials for robot:

  • shovel;
  • wind;
  • expanded clay and pebbles;
  • clattering or gravel fraction up to 40mm;
  • medium-grained sand;
  • clay;
  • finish coating: linoleum; slabs OSB or chipboard, plywood; porcelain stoneware and ceramic tiles.

Important!

Watery soils allow the hairs, which are found in them, to penetrate into the basement, creating the necessary atmospheric mind for the storage of food reserves.

Application that sings, establishes convection, creates the effect of a pump, that vaporizes the water. Qi vipari hang on the surface, and the earth absorbs excess water. The circle of the homeland is established.

Clay pidloga

Stages of work with the installation of clay bricks:

  1. Prepare the bottom, dig the soil by 40 cm and strengthen it with a vibrating plate or a skating rink.
  2. Vikonati vіdsipannya expanded clay up to 10 cm zavviški. This ball will serve as heat insulation.
  3. Zmіshati klatsannya with clay and viklasti sumish, scho viishla, up to 17 cm high. Good tamp the ball.
  4. Let the first layer dry.
  5. Fill with a cement-filled warehouse with a thin ball, dodatkovo zmіtsnivshi nasip crushed stone. Let dry.
  6. Lay another ball with crushed stone up to 10 cm high, diligently ramming the surface. Dry.
  7. Continue laying sumish from clay and clattering, changing the height of the ball by 1.5-2 times to the required height of the pidlog.
  8. Let the cake dry again. Zakrіpiti with a rare variety of clay and a vapny-clay variety.
  9. On the plots high level groundwater, a waterproofing ball is installed from roofing material, bituminous mastic, concrete screed.
  10. Cover the finish.

Rozchin for ceramic lining

Oblashtuvannya pidloga for lags

Under the logs in the basement along the logs there were traces of land on the plots from the garnoy water penetration. Otherwise, a wooden structure can be slender to the point of rotting.

Laying log

Materials for the possession of logs in the basement of the booth behind the lags:

  • wooden beams with a diameter of 15cm;
  • tongue-and-groove boards 5 cm wide;
  • antiseptic;
  • ruberoid;
  • flower heads 7cm;
  • hammer.

Sleeping a booth behind the lags

Stages of arranging pidlogs for lags:

  1. It is necessary to treat the whole tree with an antiseptic treatment, attaching special respect to the areas of the plant and the ends.
  2. Doshki vymіryuyutsya for rozmіrom 2-3 cm shorter, lower dozhina primіshennya. Vіdrіzati nebhіdnu іlkіst vіdrіzіv.
  3. At the mіstsі roztashuvannya lag fit 2 balls of roofing material.
  4. Logs are installed with a winder up to 3 meters.
  5. On top of the lag, there are pads of paddles, which are tongue-and-groove, I will step on the skin in the front groove.
  6. Flowers should be hammered under a small stubble.

Logs for pidlog

Monolithic slab

To the peculiarities of the monolithic "Swedish plate", thermal insulation of the foundation and the base from the sides and from the bottom can be seen. The basis of the warehouse is a tamping ball made of sand cement and pebbles or other drainage material. A slab is laid on top, reinforced with a 12-millimeter bar and with built-in heating communications.

Monolithic concrete slab

Advantages of the "Swedish plate":

  • heat-insulating material;
  • communications built into the stove, which will significantly speed up the installation;
  • do not need additional screed and surface surfacing;
  • A 20-centimeter ball of insulation miraculously absorbs heat, lowering it into a scorched booth;
  • no special equipment is needed, robots can be worked independently.

Monolithic concrete slab

Tools and materials for cladding of monolithic underlays:

  • monolithic slabs;
  • gravel, crushed stone;
  • vibrating plate or garden forging;
  • concrete;
  • putty;
  • primer;
  • finish with a more polished finish.

Monolithic slab

Stages of installation of a monolithic slab:

  1. Preparing a foundation pit for 50 div.
  2. Zasipati gravel, slag or expanded clay, the beast pіdsipati pіskom, relatively tamping with a vibrating plate or garden forging.
  3. Installation of a drainage ball and communication pipes.
  4. Repeated ball of gravel with a squeak, relatively tamping.
  5. Lay 2 balls of extruded polystyrene foam for thermal insulation. The height of the heat insulation is 20cm.
  6. Reinforcement with a 12-millimeter bar.
  7. Laying pipes for "warm water".
  8. Pouring a concrete slab with a height of 10cm. Retainer drying.
  9. Puttying cracks after lighthouses, priming.
  10. Lined with finishing materials.

Construction for the installation of a monolithic slab

The basement in the basement of the booth is lined and ready for operation. As a kind of rank, yogo mount an individual choice of skin. It is important to remember that it is significant to bring the depth of the foot down to the transcendental level. Therefore, it is worthwhile to win the waterproofing.

Installation of a monolithic slab

In low pіdpіllakh, it is sufficient to cover the air with perimeter kums. Sokolnі on top of the sound of mayut vіkna, to natural ventilation you will be enough.

Insulated Swedish stove